Hammer mill and Pellet Mill Replacement Parts
A Worldwide Leader in Replacement Parts for Mills Since 1934.
Upcoming Events
Our Mill Products & Services
Hammer Mills
Hammers
Rods and Spacers
Screens
Pellet Mills
Dies
Roller Shells
Die & Shell Rework
While running the Andritz hammer mill we were having to change the hammers every 1-2 weeks. Once we worked with Jacob’s and change the hammers along with a few other adjustments in the pattern, we were able to get 4-5 weeks of life out of the hammers.
“Maintenance Manager said he is now a Jacobs guy as the performance of the die he has been using is getting 30% to 35% more tonnage compared to [Competitor].”
“My operators love the Lightning Die and would kill me if I switched back. The Lightning Die solved many of our pelleting problems!”
“Jacobs rods last a full year with very little grooving, competitors rods needed changed out every 6 months due to excessive grooving.”
“Shawn said all parts in the mill plus Die Clamp went in great and looks amazing. The Die Clamp is better than any competitors. Wants a quote on another Die, entire assembly and rolls shells!”
“Gold star for pentagons! We are getting the best grind we have ever had and are happy about that!”
“Our pelleting process had some inefficiencies, we were seeing rather poor performance from our process and short lifespans from our dies and rolls. . With Jacobs we built a new protocol for our process, from our feed temps, all the way through roll setups. We have been running for several months now and our pelleting production numbers are fantastic, some of our products we increased our performance by over 50%, that translates to multiple tons per week in increased efficiency. We did see an increase in all of our TPH across the board. “
“Josh said the Jacobs Die has out performed anything they have used in the past. Very pleased!”
“1st Die ran for 18 Months on 30 TPH mill and ran 172,278 Tons. 2nd Die installed July 7th 2015 and it is over 144,000 tons now and still going!”
“We recently switched to Pentagon Hammers; the installer said the hammers went on so smooth, they thought something was wrong. Took 20 minutes to install 120 hammers. After a week, the hammers were inspected and there were a few sticking out. Touched them and they fell down. In the next two inspections, all hammers were down.”