Hammer mill and Pellet Mill Replacement Parts
A Worldwide Leader in Replacement Parts for Mills Since 1934.
Upcoming Events
Our Mill Products & Services
Hammer Mills
Hammers
Rods and Spacers
Screens
Pellet Mills
Dies
Roller Shells
Die & Shell Rework
“Installing a replacement Pentagon set, the first one lasted 102 weeks!”
“The hammers held up 4X longer than the previous hammers and price is great! Have now switched to Jacobs screens.”
“The Pentagon Hammer Set we have in our Roskamp meal grinder is working very well. I’ll be buying at least two more Sets of these hammers for our other machines.”
“The Triple Threat Hammers have been working exceptionally well on our Jones Mill. I have been very impressed. We weren’t getting the hours from [Competitor], and they were only lasting about 2 months. Jacobs has been running for 4 months and is still running for less money.”
“We recently switched to Pentagon Hammers; the installer said the hammers went on so smooth, they thought something was wrong. Took 20 minutes to install 120 hammers. After a week, the hammers were inspected and there were a few sticking out. Touched them and they fell down. In the next two inspections, all hammers were down.”
“Our pelleting process had some inefficiencies, we were seeing rather poor performance from our process and short lifespans from our dies and rolls. . With Jacobs we built a new protocol for our process, from our feed temps, all the way through roll setups. We have been running for several months now and our pelleting production numbers are fantastic, some of our products we increased our performance by over 50%, that translates to multiple tons per week in increased efficiency. We did see an increase in all of our TPH across the board. “
“Shawn said all parts in the mill plus Die Clamp went in great and looks amazing. The Die Clamp is better than any competitors. Wants a quote on another Die, entire assembly and rolls shells!”
“Very pleased with Bad Ax Hammers. Mill has less vibration, first corner 250 to 260 hours, 2nd corner at 180-190 and still going”
“The Lightning Die has increased our production 30%+. The Die has been on for 4,000+ hours and still doing great. We added storage bins, which now was a waste of money as we have increased production and use the raw materials as fast as it comes in. I can’t believe the whole industry doesn’t jump to the Lightning!”
“1st Die ran for 18 Months on 30 TPH mill and ran 172,278 Tons. 2nd Die installed July 7th 2015 and it is over 144,000 tons now and still going!”