Hammer mill and Pellet Mill Replacement Parts
A Worldwide Leader in Replacement Parts for Mills Since 1934.
Upcoming Events
Our Mill Products & Services
Hammer Mills
Hammers
Rods and Spacers
Screens
Pellet Mills
Dies
Roller Shells
Die & Shell Rework
“Had Lightning Die on for 18 months on the 30 ton mill and ran 172,278 tons through it. Want one just like it for the 7932 mill. Love them!”
“After the Jacobs guys came out and helped our operators they are now more confident in their ability to raise the temperature and push the pellet mill to its limits. With the lightning dies installed we are seeing the amperage drop and our cooler is being overrun. What a great company to work with!”
“We recently switched to Pentagon Hammers; the installer said the hammers went on so smooth, they thought something was wrong. Took 20 minutes to install 120 hammers. After a week, the hammers were inspected and there were a few sticking out. Touched them and they fell down. In the next two inspections, all hammers were down.”
“The Lightning Die has increased our production 30%+. The Die has been on for 4,000+ hours and still doing great. We added storage bins, which now was a waste of money as we have increased production and use the raw materials as fast as it comes in. I can’t believe the whole industry doesn’t jump to the Lightning!”
“Dale said the Lightning Die he has on mill #2 has 600 hours on it and is still the best running mill!”
“What Chad has told me has come true, the Lightning out performed [Competitor] and the other new dies out there hands down!”
“Our pelleting process had some inefficiencies, we were seeing rather poor performance from our process and short lifespans from our dies and rolls. . With Jacobs we built a new protocol for our process, from our feed temps, all the way through roll setups. We have been running for several months now and our pelleting production numbers are fantastic, some of our products we increased our performance by over 50%, that translates to multiple tons per week in increased efficiency. We did see an increase in all of our TPH across the board. “
“Installing a replacement Pentagon set, the first one lasted 102 weeks!”
“Very pleased with Bad Ax Hammers. Mill has less vibration, first corner 250 to 260 hours, 2nd corner at 180-190 and still going”
“Both mills running Pentagons. Last sets ran for about 11 months, pushing 13,000 to 14,000 ton per week. 572,000 tons of life on hammers!”