Hammer mill and Pellet Mill Replacement Parts
A Worldwide Leader in Replacement Parts for Mills Since 1934.
Upcoming Events
Our Mill Products & Services
Hammer Mills
Hammers
Rods and Spacers
Screens
Pellet Mills
Dies
Roller Shells
Die & Shell Rework
“Gold star for pentagons! We are getting the best grind we have ever had and are happy about that!”
While running the Andritz hammer mill we were having to change the hammers every 1-2 weeks. Once we worked with Jacob’s and change the hammers along with a few other adjustments in the pattern, we were able to get 4-5 weeks of life out of the hammers.
“The Lightning Die has increased our production 30%+. The Die has been on for 4,000+ hours and still doing great. We added storage bins, which now was a waste of money as we have increased production and use the raw materials as fast as it comes in. I can’t believe the whole industry doesn’t jump to the Lightning!”
After running the Dupps Grindor’s for several months changing the Dupps hammers every 2 days, we ran a trial on the Jacob’s Hammers for the Dupps Grinder and found that we were able to get 5 days of life. We run strictly all beef and bones straight from slaughterhouses.
“Been using Pentagon X2 Holeformance for 3 weeks in Champion Mill. 60 AMPS savings so increased Feed Rate which increased throughput 8%. The Champion capacity is 65 Million and Currently Running at 70-71 Million. Easy to install and fewer spacers! We removed [Brand X] Hammers from a 2nd Mill and replaced with Pentagon X2 Holeformance to get the same savings and increased throughput.”
“Jacobs rods last a full year with very little grooving, competitors rods needed changed out every 6 months due to excessive grooving.”
“The Jacobs Hammers are in the mill and outlasting the hammers we ran before!”
“Feed flow did increase, we were able to turn them up and get more AMPS on our ground grain elevator. Very satisfied with the Pentagon Hammers. Showed them to sister plant and he is interested in getting a set. I told him I was sold on them.”
“The Triple Threats are living up to the talk on our Bliss Mill. [Competitor] hammers are needing replaced and Jacobs’ barely looked used!”
“Installing a replacement Pentagon set, the first one lasted 102 weeks!”