Hammer mill and Pellet Mill Replacement Parts
A Worldwide Leader in Replacement Parts for Mills Since 1934.
Upcoming Events
Our Mill Products & Services
Hammer Mills
Hammers
Rods and Spacers
Screens
Pellet Mills
Dies
Roller Shells
Die & Shell Rework
“Both mills running Pentagons. Last sets ran for about 11 months, pushing 13,000 to 14,000 ton per week. 572,000 tons of life on hammers!”
“Been using Pentagon X2 Holeformance for 3 weeks in Champion Mill. 60 AMPS savings so increased Feed Rate which increased throughput 8%. The Champion capacity is 65 Million and Currently Running at 70-71 Million. Easy to install and fewer spacers! We removed [Brand X] Hammers from a 2nd Mill and replaced with Pentagon X2 Holeformance to get the same savings and increased throughput.”
“Ron said the Die works perfect! He wanted 3 tons per hour and got 5 Tons and is still achieving a better pellet. Is happy with the die and it will be Jacobs Exclusively from here on out!”
“The Lightning Die has increased our production 30%+. The Die has been on for 4,000+ hours and still doing great. We added storage bins, which now was a waste of money as we have increased production and use the raw materials as fast as it comes in. I can’t believe the whole industry doesn’t jump to the Lightning!”
“Very pleased with Bad Ax Hammers. Mill has less vibration, first corner 250 to 260 hours, 2nd corner at 180-190 and still going”
“Our [Competitor] die that has 500 hours on it isn’t performing as well as the Lightning Die which Currently has 6,500 hours on it. The Lightning Die is still making pellets and the [Competitor] die is struggling. Will be switching fully to Lightning Dies in the future!”
“After the Jacobs guys came out and helped our operators they are now more confident in their ability to raise the temperature and push the pellet mill to its limits. With the lightning dies installed we are seeing the amperage drop and our cooler is being overrun. What a great company to work with!”
“We recently switched to Pentagon Hammers; the installer said the hammers went on so smooth, they thought something was wrong. Took 20 minutes to install 120 hammers. After a week, the hammers were inspected and there were a few sticking out. Touched them and they fell down. In the next two inspections, all hammers were down.”
“Very Happy with the Lightning Die and don’t want to change a thing!”
“The Triple Threat Hammers have been working exceptionally well on our Jones Mill. I have been very impressed. We weren’t getting the hours from [Competitor], and they were only lasting about 2 months. Jacobs has been running for 4 months and is still running for less money.”