Hammer mill and Pellet Mill Replacement Parts
A Worldwide Leader in Replacement Parts for Mills Since 1934.
Upcoming Events
Our Mill Products & Services
Hammer Mills
Hammers
Rods and Spacers
Screens
Pellet Mills
Dies
Roller Shells
Die & Shell Rework
“Jacobs does a great job of keeping up on our screen needs – price/lead time are always better than other manufacturers.”
“Extremely pleased with Jacobs Dies. Currently saving 50% more tons on these dies than we were getting with a different supplier!”
“Maintenance sent the following numbers regarding 5 different feeds. Feed 1: 35% Increase in throughput Feed 2: 44% Increase in throughput Feed 3: 42% Increase in throughput Feed 4: 87% Increase in throughput Feed 5: 9% Increase in throughput.”
“After we installed Pentagons, we saw a 50% increase in production with a finer grind.”
“The Triple Threat Hammers are working great on my Bliss Mill! Have to order another set! Got about 5.5 months out of them; I won’t go anywhere else!”
“Installing a replacement Pentagon set, the first one lasted 102 weeks!”
“No one has better Dupps Hammers than Jacobs! We won’t be trying anyone else’s after seeing the quality!”
“We recently switched to Pentagon Hammers; the installer said the hammers went on so smooth, they thought something was wrong. Took 20 minutes to install 120 hammers. After a week, the hammers were inspected and there were a few sticking out. Touched them and they fell down. In the next two inspections, all hammers were down.”
“Our pelleting process had some inefficiencies, we were seeing rather poor performance from our process and short lifespans from our dies and rolls. . With Jacobs we built a new protocol for our process, from our feed temps, all the way through roll setups. We have been running for several months now and our pelleting production numbers are fantastic, some of our products we increased our performance by over 50%, that translates to multiple tons per week in increased efficiency. We did see an increase in all of our TPH across the board. “
“1st Die ran for 18 Months on 30 TPH mill and ran 172,278 Tons. 2nd Die installed July 7th 2015 and it is over 144,000 tons now and still going!”