Hammer mill and Pellet Mill Replacement Parts
A Worldwide Leader in Replacement Parts for Mills Since 1934.
Upcoming Events
Our Mill Products & Services
Hammer Mills
Hammers
Rods and Spacers
Screens
Pellet Mills
Dies
Roller Shells
Die & Shell Rework
After running the Dupps Grindor’s for several months changing the Dupps hammers every 2 days, we ran a trial on the Jacob’s Hammers for the Dupps Grinder and found that we were able to get 5 days of life. We run strictly all beef and bones straight from slaughterhouses.
“Very pleased with Bad Ax Hammers. Mill has less vibration, first corner 250 to 260 hours, 2nd corner at 180-190 and still going”
“Our pelleting process had some inefficiencies, we were seeing rather poor performance from our process and short lifespans from our dies and rolls. . With Jacobs we built a new protocol for our process, from our feed temps, all the way through roll setups. We have been running for several months now and our pelleting production numbers are fantastic, some of our products we increased our performance by over 50%, that translates to multiple tons per week in increased efficiency. We did see an increase in all of our TPH across the board. “
“After the Jacobs guys came out and helped our operators they are now more confident in their ability to raise the temperature and push the pellet mill to its limits. With the lightning dies installed we are seeing the amperage drop and our cooler is being overrun. What a great company to work with!”
“We recently switched to Pentagon Hammers; the installer said the hammers went on so smooth, they thought something was wrong. Took 20 minutes to install 120 hammers. After a week, the hammers were inspected and there were a few sticking out. Touched them and they fell down. In the next two inspections, all hammers were down.”
“We have one more set of [Competitor] hammers to go through and then going exclusive with Pentagons. For ease of installation and performance, the Pentagons can’t be beat!”
“Jacobs rods last a full year with very little grooving, competitors rods needed changed out every 6 months due to excessive grooving.”
“Josh said the Jacobs Die has out performed anything they have used in the past. Very pleased!”
“Installing a replacement Pentagon set, the first one lasted 102 weeks!”
“Shawn said all parts in the mill plus Die Clamp went in great and looks amazing. The Die Clamp is better than any competitors. Wants a quote on another Die, entire assembly and rolls shells!”