Hammer mill and Pellet Mill Replacement Parts
A Worldwide Leader in Replacement Parts for Mills Since 1934.
Upcoming Events
Our Mill Products & Services
Hammer Mills
Hammers
Rods and Spacers
Screens
Pellet Mills
Dies
Roller Shells
Die & Shell Rework
“We recently switched to Pentagon Hammers; the installer said the hammers went on so smooth, they thought something was wrong. Took 20 minutes to install 120 hammers. After a week, the hammers were inspected and there were a few sticking out. Touched them and they fell down. In the next two inspections, all hammers were down.”
When it comes to the Jacobs screens for the Andritz hammermill and the Dupps Grindor’s, the screens from Jacob’s were always more convenient to get and lasted longer the only time we would have to change them was when stainless went through the Grindor or Hammermill. Getting screens by the pallet is far more convenient than ordering by each.
“Our [Competitor] die that has 500 hours on it isn’t performing as well as the Lightning Die which Currently has 6,500 hours on it. The Lightning Die is still making pellets and the [Competitor] die is struggling. Will be switching fully to Lightning Dies in the future!”
“Fred wants a die like the last one. Said it is the best die he has ever run!”
“Gold star for pentagons! We are getting the best grind we have ever had and are happy about that!”
“The Triple Threat Hammers are working great on my Bliss Mill! Have to order another set! Got about 5.5 months out of them; I won’t go anywhere else!”
“I was getting 7 days out of my old supplier’s hammers and I get 10 days from Jacobs’ Hammers! Jacobs is my supplier now!”
“It will be Jacobs from here on out! The guys said Jacobs Pentagons were by far the easiest to install and they really enjoy using them versus the others.”
“Feed flow did increase, we were able to turn them up and get more AMPS on our ground grain elevator. Very satisfied with the Pentagon Hammers. Showed them to sister plant and he is interested in getting a set. I told him I was sold on them.”
“The Lightning resulted in 48% decrease in energy with 19% increase in throughput. Savings $32K!”